Skip to content

Post-Construction Cleaning
ready for handover

Thorough cleaning after construction, renovation or fit-out work. We remove construction dust from every surface — floors, walls, ceilings, windows, ductwork — so your project is ready for handover or occupancy.

Construction has finished, but the site isn’t ready for handover

Every construction project ends with the same problem: the space is ready but full of dust, debris and paint splatters.
SPS Grupp provides complete post-construction cleaning. We deep-clean every surface and prepare the site for handover.

What does post-construction cleaning include?

01.
Construction Dust RemovalHEPA-filter vacuuming of all surfaces — walls, ceilings, ledges, pipes and ductwork
02.
Window and Glass Cleaningremoval of stickers, paint splatter, plaster residue and construction film from all glazing
03.
Floor Deep Cleaningprotective film removal, adhesive residue cleanup, mopping and polishing of all floor surfaces
04.
Sanitary Fixture Cleaningdeep clean and polish of all toilets, sinks, taps, mirrors and fittings
05.
Kitchen and Break Area Preparationappliance cleaning, worktop sanitising, cupboard wipe-down inside and out
06.
Ventilation and Duct Cleaningcleaning of visible ductwork, grilles and vents to remove construction dust
07.
Waste and Debris Removalcollection and disposal of remaining construction waste, packaging and offcuts

Why choose SPS Grupp for post-construction cleaning?

Construction-Aware Teams

Our post-construction cleaners understand building materials and finishes. They know which chemicals are safe on which surfaces and won't damage new installations.

Handover-Ready Results

We clean to handover standard — every surface, every corner, every fixture. Your client walks into a finished space, not a building site that's been swept.

Flexible Timing

Construction schedules change. We adapt — starting earlier, working evenings or weekends, splitting into phases — to meet your handover deadline.

Full Waste Management

We don't just clean — we remove construction waste, packaging and debris so you don't need a separate waste contractor for the final clear-out.

SPS Grupp ehitusjärgne koristus

Post-construction cleaning pricing

Post-construction cleaning starts from €250. The final price depends on the size and condition of the property and the complexity of the work.

Small Fit-Out
from €250
up to 100 m²
Medium Project
from €450
100–300 m²
Large Site
from €800
300–1,000 m²

Construction-waste removal is priced separately according to volume. Combining cleaning and waste removal can simplify coordination and may reduce the overall cost.

How does SPS organise post-construction cleaning?

A clear process makes ordering the service easier.

Site information

We clarify the spaces.

Work allocation

We determine cleaning needs.

Execution

We clean from top to bottom.

Details

We remove stickers.

Handover

We check readiness.

We help you find the optimal solution for your cleaning needs

Fill out the form and we will generally contact you within one business day.

Allowed: JPG, PNG, PDF up to 10 MB

Data is transmitted securely using encryption. We generally respond within one business day.

FAQ

We answer the most common questions about our cleaning service. If you have any questions, please get in touch.

Request a quote